Experience / Completed Projects

Reconstruction Design of Aiviekste Hydroelectric Power Plant. Client: Ltd “ENERGOREMONTS RĪGA” ; [2019]
Inspection and design for restoration works of Pļaviņu HPP upstream eleboration of concrete surfaces . Client: Inc Latvenergo ; [2019]
Renovation design of Gatupes polder dam D-1 and D-2. Client: State Ltd«ZMNI» ; [2018]
Renovation design and author supervision of Kapune polder dam D-1 and D-2. Client: State Ltd "ZMNI" ; [2017]
Construction design of Sinole HPP dam gate replacement. Client: Ltd „MHK Abuls””. ; [2017]
Pre-project and technical design of Iori HPP. Client: Iory HYDRO Ltd (Georgia) ; [2016]
Pre-project and Technical design of Chapala HPP. Customer: AAD LTD (Georgia); [2016]
Design of floodgate reconstruction, Rēzeknes river bed deepening and deffensive wall building in the teritory of Rezeknes city. Client: Rezeknes city dome.; [2016]
Construction design of a pontoon pathway over the Ogre river. Client: Municipality of Ogre; [2016]
Author supervision and design for the construction of the Pakuļi HPP - spillway. Client: Ltd „MHK Abuls””; [2016]
3D model design of Plavinu HPP. Client: Inc "LATVENVERGO"; [2016]
Technical design for hold bars and cleaning mechanisms of Spridzenu HPP. Client: Ltd „Spridzenu HPP”; [2016]
Technical Design for Renewal of Eight Historical Pond Cascades and Landscaping. Client: Specially Protected Cultural Monument - Turaida Museum Reserve; [2016]
Technical design and author supervision for replacement of Kegums HPP dam gates. Client: AS “LATVENERGO”; [2016]
Technical design for forest drainage system reconstruction in objects - „Jāņupe” (606 ha), „Skujnieki” (773 ha), „Dorupe” (1116 ha), “Spicmežs” (612 ha); „Glīzda” (1069 ha), Zemgales and Vidzemes districts. Client : Latvijas Valsts meži; [2015]
Technical design of Aiviekstes HPP inflatable rubber gates. Client: AS "LATVENERGO"; [2015]
Hydraulic modeling of Rigas HPP water spillway stilling basin. Client: AS "LATVENERGO"; [2015]
Development of wind power station location maps and geological exploration in Finland, Simo - 26 wind power station . Client - Infracat Oy; Mitta Oy; [2015]
Preperation of technical and tender documentation for modernization and renovation of Jebba un Kainji HPP (Nigeria) hydrotechnical structures. Client: „Mainstream Energy Solutions Ltd” (MESL) and RusHydro International AG; [2013]
Technical supervision of reconstruction of Plavinas, Ķegums and Riga hydroelectric power plants hydropower units. Client: “SWECO” ; [2013]
Reconstruction of Water Heating and Power Boilers for NoX Emission Reduction at Riga Thermal Power Plant 2 - technical consultation. Client: Vattenfall Power Consultant AB (Sweden); [2011]
Bartogaya Dam condition Assessment and Design for Construction of Hydro Power Plant with Total Capacity 25 (Kazakhstan) Client - AKK Astana.; [2011]
Control System - IFS Applications Implementation at Power Plants. Client: JSC Latvenergo; [2010]
Plavinas HPP Reserve Spillway Design. Client: JSC Latvenergo; [2010]
Vibration Measurements of Plavinas HPP at High Heads. Client: JSC Latvenergo; [2009]
Inspection and Renovation of Riga HPP Railway Bridge. Client: AS "Latvenergo"; [2009]
Bulkhead Gate Slot Inspection at Riga HPP. Client: JSC Latvenergo; [2009]
Renovation Design of Kegums HPP Tilting Spillway Gate . Client: JSC Latvenergo; [2008]
Design and technical supervision of Plavinas, Kegums, and Riga HPP Technological Equipment renovation Client: Inc Latvenergo; [2008]
Design and technical supervision of Riga Thermal Power Plant 1 technological equipment renovation. Client: Inc Latvenergo; [2008]
Renovation of Forest Reclamation System at "Lapsukalns", Eastern Vidzeme region. Client: Latvian State Forests; [2008]
Inspection and Development of Terms of Reference for Plavinas HPP Crane Railway Bridge Girder Repair. Client: JSC Latvenergo; [2008]
Technical Design of Plavinas HPP Hydropower Unit reconstruction. Client: Fortum Power And Heat Oy; [2008]
Renovation of Kegums HPP Electromechanical Equipment. Design Management and Technical Supervision. Client: JSC Latvenergo; [2007]
Renovation of Aiviekste HPP Electromechanical Equipment. Design Management and Technical Supervision. Client: JSC Latvenergo; [2007]
Development of Flood Protection for Road, Electric Network, Sewage, and Water Supply Systems for Land Plots "Pārrupes" and "Viļni", Ogre region. Client: Ogres nami; [2007]
Design and Technical supervision of Plavinas, Kegums, and Riga HPP Technological Equipment. Client: Inc Latvenergo; [2007]
Reconstruction Design Management and Technical Supervision of Plavinas HPP Hydropower Unit . Client: Fortum Power And Heat Oy; [2007]
Reconstruction Design Management and Technical Supervision of Riga HPP Wastewater Facilities . Client: JSC Latvenergo; [2007]
Reconstruction project Management and Technical Supervision of Riga HPP Industrial Water Supply System . Client: JSC Latvenergo; [2007]
Renovation of Riga HPP Electromechanical Equipment. Design Management and Technical Supervision. Client: JSC Latvenergo; [2007]
Renovation of Plavinas HPP Electromechanical Equipment. Design Management and Technical Supervision. Client: JSC Latvenergo; [2007]
Reconstruction Design Management and Technical Supervision of Earthing Devices of Plavinas HPP Hydropower Unit. Client: Inc Latvenergo ; [2006]
Renovation Design Management and Technical Supervision of Plavinas HPP Hydropower Unit . Client: Inc Latvenergo; [2006]
Renovation Design Management and Technical Supervision of Riga HPP Hydropower Unit. Client: Inc Latvenergo; [2006]
Design and Implementation of Energy Meter Remote Control System. Client: Bank of Latvia ; [2006]
Electrical Equipment Safety System Inspection and Replacement Design of Line Transformer. Client: Bank of Latvia; [2006]